The interior construction consisted of underground plumbing and electrical rough-in, concrete patchwork associated with rough-ins, painted drywall partitions and bulkheads, two-way mirrors, 2 x 2 acoustical ceiling tile and grid, prefinished wood pocket doors and hollow metal frames, custom millwork benches, reception desk, lab casework and display cases, FRP wall panels, carpet, VCT and pre-engineered laminate flooring. The plumbing service incorporated new underground sanitary and associated domestic water for a janitor’s closet, lab sinks, electric water cooler, and break area. The existing fire sprinkler and fire alarm were modified for the space requirements.