The City of Westminster Administrative Office Building project was a complete renovation of an existing bank in downtown Westminster. Mechanical, Electrical and Plumbing systems were all completely replaced. Interior finishes included glass partitions, new offices, meeting rooms, and multi-purpose training rooms. The 2-story main lobby featured radius walls and suspended ceiling clouds for a unique architectural look. The exterior featured new curtainwalls and storefront to give the traditional building a more modern appearance.
Frederick County Public Schools Central Administration Building is a design-build 5-story office building including all interior finishes totaling 90,000 SF. Warner Construction teamed with Zavos Architecture + Design to create a design to consolidate offices and meeting space for administrative personnel spread throughout the County into one building. The building’s structure is a structural cast in place frame that bears on drilled caisson foundations. The skin of the building is an interesting mixture of masonry veneer, cast stone, pre-finished metal panels, and curtainwall. The roofing system is a barrel vault standing seam metal roof and EPDM. The interior of the building includes administrative offices, a TV studio, and a Board Room for 300+ people.
East All Saints Parking Garage is a post-tensioned cast-in-place concrete parking structure with seven (7) elevated levels above ground and one (1) level of parking below grade, which is supported by a mico-pile foundation system, with the ground floor having multiple retail spaces. The façade of the garage consists of hand-laid brick, precast concrete sills, and headers, glass fiber reinforced concrete cornices, with storefront and canopies at the retail areas.