Specialty

 

Air Traffic Control Tower

Air Traffic Control Tower

Client: City of Frederick
Location: Frederick, Maryland
Architect: CTBX Aviation Group, LLC
Building Area: 2,232 SF
Construction Cost: $3.5 Million

Project Description:

Sitework: Grading, Utilities, Access road paving, Site Security Fencing
Foundation: Micropile sub-foundation, Cast-in-Place Concrete Footing
Structure: Precast Concrete Wall Panels, Structural Steel Control Cab
Façade: Colored Precast Concrete, Curtainwall Glazing, Composite Metal Panels at Control Cab
Roof System: TPO Membrane
Finishes: Interior Gypsum Board Partitions, VCT and Access Flooring, Acoustical and Drywall Ceilings
Mechanical: Split-System and Fan Coil Units with Cooling Tower, Sprinkler Fire Protection with Fire Pump
Electrical: 1600A Electrical Service, Lightning Protection with Buried Counterpoise, 150KW Emergency Generator, Aiphone System, Air Traffic Control Equipment


 

City of Frederick Parking Deck #5

City of Frederick Parking Deck

Client: The City of Frederick
Location: Frederick, Maryland
Architect: Desman Associates
Building Area: 7 Story, 115,000 SF
Construction Cost: $10.8 Million

Project Description:

Sitework: Sheeting & Shoring, Mass Excavation Site Utilities, Brick Pavers, Asphalt and Landscaping
Foundation: Micropile Foundation
Structure: Post Tensioned Cast in Place Concrete
Façade: Structural Concrete, Cast Stone & Brick Veneer, Architectural Louvers, and Anodized Aluminum Storefront
Roof System: EPDM Over Retail Areas and Stair Towers
Finishes: Exterior Coating System, Painted Concrete Surfaces, Ceramic
Mechanical: Self Contained Heat Pumps, Ventilation Exhaust Systems
Electrical: New 450 AMP Service for Garage and 600 AMP Service for Retail

Awards and Recognition:

  • 2011 ABC Excellence in Construction Award – 1st Place
    - Industrial ($5-$15 Million)

 

Mount St. Mary’s Visitor Center

Mount St. Mary's Visitor Center

Client: Mount St. Mary’s University
Location: Emmitsburg, MD
Architect: MM Architects
Building Area: 4,500 square feet
Construction Cost: $2 Million

Project Description:

Sitework: Mass grading, site utilities, asphalt and concrete paving
Foundation: Slab on Grade, Concrete Spread and Perimeter Footings
Structure: Structural steel, steel and wood framing, timber framed roof
Façade: Mixed veneer of cultured stone and fiber cement siding
Roof System: EPDM membrane and simulated slate roofing
Finishes: Carpet, Ceramic, and VCT Flooring, Painted Drywall Partitions, 2 x 4 ACT, and Pre-Finished Wood Doors
Mechanical: 12 Tons of Split System Units, Domestic Well water service
Electrical: 400 AMP Service, Power Distribution, Lighting, Fire Alarm, Communications Systems


 

The projects represented above are a small sampling of completed projects. If you are interested in a seeing our full portfolio, please contact us!

⇒ See all project types